Euromix® Duo

EUROMIX® 4000 SM DUO is an economically and ecologically sustainable solution for mobile mass concrete production directly on the construction site.

Up to 300 m³ of hardened concrete can be produced per hour with the machines in DUO operation; and that applies 24 hours a day, 7 days a week in all weathers. The 6-chamber feeding hopper with swivel belt supplies both mixing plants alternately with the required aggregates. The foundation-free installation and electrical system with plug-in connections allow the SBM plants to be moved quickly and easily to the next construction site.

Mobile concrete production with EUROMIX® plants on the construction site delivers the following advantages:

  • Time-independent material delivery
  • Reliable 24/7 concrete production, just-in-time
  • No dependency on public transport
  • Significantly fewer truck journeys
  • CO2 emissions are reduced by up to 25%
EUROMIX® DUO 3000 4000
Output capacity of hardened concrete [m³/h] 230 300
Mixer output of hardened concrete [m³/batch] 2 x 3.00 2 x 4.00
Filling volume mixer [l/batch] 2 x 4500 2 x 6000

  • Completely galvanised steel structure
  • Powerful twin-shaft mixers
  • Modularly expandable
  • Ready-for-operation transport units
  • Ramp approach directly at the hopper unit
  • Compact construction